Construction site with drilling rig and workers in hard hats against clear morning sky

Industry Accreditations & Awards

AGS
2024
ISO
2023
ASCE
2023
OSHA
2024
ENR
2022

14,000 Boreholes.
Zero Foundation
Failures.

Since 1987, BoreFoundation has driven steel and concrete into the most challenging ground conditions on earth — so that every structure above it stands for centuries without settling a millimeter.

37 yrs
Operating Since 1987
6 continents
Active Project Regions
340m
Deepest Pile Driven
Scroll

Capability Evidence

The Numbers That
End the Argument.

Every figure below is drawn from project records, not marketing estimates. Audited annually by an independent QA panel.

340m
Deepest Pile Driven

On the Meridian Bridge Replacement in British Columbia, our rotary percussive rigs penetrated 340 metres of fractured granite and glacial till to reach competent bedrock — a depth record for the Pacific Northwest. The bridge has carried 22 million vehicle crossings since commissioning without a single differential settlement event.

"BoreFoundation gave us the pile schedule on day one and never moved it. That's the only reason we made the pour window."

— D. Hargreaves, P.Eng., Senior Structural Engineer, Meridian Bridge Project

99.97%
On-Time Project Delivery

Across 2,100+ site investigations and 847 deep foundation installations since 2005, BoreFoundation has missed a contractual pour date three times — all attributable to force-majeure flooding events. Every other mobilization has arrived on schedule, logged, and departed before the GC needed the pad.

"Three missed dates in twenty years. That's the number I use when I'm defending the spec to an oversight board."

— M. Okafor, Municipal Infrastructure Director, City of Edmonton

2,100+
Site Investigations Completed

Every investigation produces a full borehole log, lab analysis report, and geotechnical interpretation memorandum — not a summary sheet. Our data library now covers 14 geological provinces across North America and represents the largest proprietary subsurface dataset held by a specialty geotechnical contractor.

"The log quality is peer-review ready out of the box. We submit it to the municipal engineer as-is."

— Dr. S. Lindqvist, P.Geo., Principal Geotechnical Engineer, Apex Structural Consultants

Project Evidence

The Ground Doesn't
Lie. Neither Do We.

Documentary photography from active sites. Metrics drawn from post-construction monitoring reports.

Highway interchange construction with concrete piers and heavy equipment on a clear day
Infrastructure

Edmonton, AB — 2023

Yellowhead Interchange Expansion

Soft lacustrine clays to 22m depth required a full pre-augering program before driven H-pile installation. BoreFoundation completed the geotechnical investigation, pile design, and installation within a 14-week weather window — two weeks ahead of schedule.

1,240
Auger Cast Piles Installed
View Report
Modern hospital exterior with glass facade under blue sky
Commercial

Calgary, AB — 2022

St. Clare Medical Centre

Hospital structures demand near-zero differential settlement. Our 480 micro-pile installation into Paskapoo sandstone delivered a measured settlement of less than 0.3 mm at 18-month post-load monitoring.

0 mm
Post-construction Settlement
Details
Industrial site with heavy machinery and steel structures in overcast conditions
Industrial

Fort McMurray, AB — 2021

Kearl Oil Sands Containment Berm

Muskeg and thaw-sensitive permafrost demanded thermal pile analysis before any steel was driven. BoreFoundation's ground-freeze monitoring program prevented frost-heave damage across the full berm perimeter.

18 km
Sheet Pile Perimeter Driven
Details

Peer-Reviewed Methodology

Tested Against
Every Failure Mode.

Our investigation and installation process has been independently peer-reviewed by three university geotechnical departments and cited in fourteen journal publications since 2018.

01

Desk Study & Site Walk

Geological maps, borehole archives, and a physical walk before a single rig is mobilized. No surprises on the invoice.

02

Intrusive Investigation

Rotary core, SPT, CPTu, and piezometer installation. Every test follows ASTM D-series or equivalent CSA standards.

03

Laboratory Classification

Grain-size, Atterberg limits, consolidation, and triaxial shear — ISO 17025 accredited lab, chain-of-custody documented.

04

Design Recommendation

Pile type, depth, load capacity, and settlement prediction with sensitivity analysis — peer-reviewed before issue.

05

Installation & QA Monitoring

Dynamic load testing, integrity testing, and settlement monitoring through the full construction sequence.

Referenced & Cited In

Canadian Geotechnical JournalJournal of Geotechnical Engineering (ASCE)GéotechniqueEngineering GeologyInternational Journal of Geomechanics

Technical Resource Hub

Proof Before
the Ask.

Every resource below is drawn from active project work. We earn the download by showing you the evidence first.

Gated Download

Site Investigation Guide

64-page guide covering borehole spacing, sampling frequency, lab test selection, and report interpretation — written for structural engineers specifying foundation systems.

No spam. Unsubscribe at any time. We do not sell your data.

Need to evaluate reporting quality first?

Request a redacted borehole log from a completed project — same format we deliver on your site.

Request Borehole Log Sample
Technical engineering drawing of pile cross-section on drafting table
White Paper
42 pp
Design

Driven Pile Design in Soft Lacustrine Clay

Full design methodology, load test interpretation, and settlement prediction for Alberta lake-bottom deposits.

Access Resource
Engineer reviewing data charts on laptop at field site
White Paper
28 pp
Investigation

CPTu Interpretation for Pile Capacity

Step-by-step workflow for converting CPTu soundings to unit skin and tip resistance values using the Eslami-Fellenius method.

Access Resource
Close-up of soil sample classification chart with grain size curves
Reference Sheet
2 pp
Investigation

Soil Classification Reference Sheet

USCS and AASHTO classification tables, Atterberg limit chart, and grain-size envelope comparisons in a single laminated A3 format.

Access Resource
Presenter speaking to engineers at a technical conference with geotechnical slides behind them
Webinar
2 hr
CPD

Dynamic Load Testing — Webinar Recording

Two-hour CPD-accredited webinar covering CAPWAP signal matching, EOID vs. restrike interpretation, and field QA protocols.

Access Resource
Drilling rig operator at micro-pile installation site with safety equipment
Case Study
18 pp
Installation

Micro-Pile Installation in Karst Terrain

Case study from a 240-pile hospital project in Manitoba where void detection and pre-grouting were required before driven installation.

Access Resource
Geotechnical instruments and monitoring equipment at construction site
Webinar
90 min
CPD

Settlement Monitoring Best Practices

Protocol for installing, reading, and interpreting survey monuments, inclinometers, and vibrating-wire piezometers through the construction sequence.

Access Resource